Energizing Business Sustainability

Your Partner in Energy Efficiency

New Road Energy is a self-performing commercial contractor specializing in solar, electrical, and HVAC systems with a focus on energy efficiency and long-term value for our clients. Founded by industry professionals with deep field experience, we’ve built our reputation on doing things the right way — from the first conduit run to the final inspection.

We serve developers, general contractors, and building owners across the Northeast with turnkey design-build services that prioritize quality, compliance, and timeline integrity. Our team understands the demands of complex job sites, and we pride ourselves on clear communication, clean installs, and delivering projects that last.

At New Road Energy, we’re not just building systems — we’re building trust, one project at a time.

Contact Us Now

Our Partnership Pathway

The Process:

1. Contract Signature

  • Gather all necessary documents.
  • Ensure all parties review the agreement.
  • Sign the contract to formalize the engagement.


2. Site Survey (1-2 days)

  • Schedule a visit to the site with the client.
  • Perform a detailed inspection of the premises including the roof/land, electrical room, and router locations.
  • Set up safety zones and access points as needed.
  • Collect measurements and assess the structural integrity for weight loading.


3. Professional Engineer Review (if necessary)

  • Arrange a second visit by a Professional Engineer to validate initial findings.


4. Engineering/Design (1-3 weeks)

  • Compile site survey data to create a preliminary design.
  • Review and refine the design in the office.
  • Present the final design to the customer for approval.


5. Permitting (4-6 weeks)

  • Prepare and submit permit applications to local, utility, and state authorities.
  • Collect customer signatures for certain application parts before and after job completion.


6. Installation (1- X weeks)

  • Determine site logistics for equipment storage.
  • Conduct the installation, ensuring minimal disruption and coordination with the client for any necessary power shutdowns.
  • Maintain clear communication regarding facility use, such as bathroom access or the need for portable facilities.


7. Commissioning (2-4 days)

  • Perform system tests.
  • Connect the system to online monitoring platforms.


8. Inspections/Final Paperwork (4-8 weeks)

  • Schedule and facilitate township inspections.
  • Follow up on the installation of the Net Meter by the utility company.
  • Complete and submit final paperwork for state approval and incentive programs.
  • Acquire necessary client signatures.


9. Job Closeout

  • Deliver all final paperwork and instructions to the client.


At each stage, it's essential for us to maintain open lines of communication with you, providing updates and coordinating access and logistics as required. The timeline provided should be used as a guide, with the understanding that some stages may overlap or require adjustment based on the project's specifics or external factors such as permitting and inspection schedules.

Contact Us Now

Copyright © 2025 New Road Energy - All Rights Reserved.

  • FAQs
  • Electrical Services
  • Solar Services

Powered by

Interested in solar for your business?

See if your business ticks the checklist!

Click here for the Solar Business Checklist